OUR RECENT PROJECTS

CITY OF CHANDLER

LOYTEC Competence Partner MPBAS won the project and delivered on a multi-vendor CEA-709 open protocol system managed by LOYTEC LINX Automation Servers. The project spanned 15 buildings across [...]

BOULDER CREEK HIGH SCHOOL

As you are Driving past Anthem Arizona on the East side of the highway you can spot this modern campus. MPBAS provided the building automation system as this site was being constructed. This is [...]

HAYDEN FERRY III

Hayden Ferry Lakeside Tempe is a new 10-story high-rise business complex that required start-of-the-art HVAC equipment, interactive sequences between complex system, a sophisticated and open [...]

2800 TOWER

Over 20 years MPBAS has been working with Gaedeke Group on servicing and upgrading this building. For the last 8 years MPBAS has replaced all of the control system with a new LonWorks system. A [...]

YUMA INTERNATIONAL AIRPORT

The existing Wattmaster system was outdated and the user interface was no longer supported. MPBAS replaced an IC chip on each unit controller and updated the software to current product. A big [...]

TUMBLEWEED RECREATION CENTER

MPBAS provided a LonWorks based building automation system with a state of the art Loytec HTML-5 user interface. You should see this system scream.

Universal Technical Institute

UTI trains students for careers in the automotive trades, MPBAS maintains their facility energy management system

Beatitudes Campus

For the Beatitudes Campus, MPBAS provided a LNS-based Lonworks system to automate the buildings' HVAC controls.

Red Mountain Library

MPBAS replaced a failing proprietary EMS system with a new Distech/Tridium AX building control system to meet the City of Mesa's standards. MPBAS provided new VFD's for the pumps and fans and [...]

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search